Help Center

PDM

Create a change notice

Legacy ZIXEL documentation. Screens and plan limits may differ from the current zCAD Beta. View current 3D CAD help.

Complete the change notice form

Steps:

  1. Sign in as an organization administrator, engineering change administrator, or engineering change editor.

  2. Click New change notice in the upper-right corner of the change request list.

    New change notice button

  3. Enter the basic and additional fields in the dialog.

  4. Fields marked with an asterisk (*) are required.

    New change notice form

  • Ways to create a change notice

    Page

    Action

    Result

    Automatic creation

    A change request is approved.

    Depending on the organization's configuration, a linked change notice is created automatically.

    The change notice creator is taken from the linked change request's creator。

    Notice name, change type, priority, required date, linked products (model, name, product manager, and project manager), purpose, requesting party, switchover time, and before-change data: copied by default from the linked change request fields.

    If a change notice has already been created automatically, withdrawing and resubmitting the change request will not create another notice when approval completes again.

    Change notice list

    Click New change notice.

    The new change notice form opens.

    On submission, the system checks that a change request is linked.

  • Change notice fields

    Field

    Description

    Name

    The change notice name is required and can contain up to 64 characters.

    Code

    The change notice code is generated using the organization's numbering rules. No code is generated if no numbering rule is configured.

    Linked requests

    Choose the change requests linked to this notice. You can select more than one.。

    Only change requests with an Approved lifecycle status can be selected.

    A change request can link to multiple existing products. When selecting drawings, documents, or parts, the linked file space is selected by default.。

    A product can link to multiple projects, so the product manager and project manager fields can contain multiple values.。

    Change plan

    Describe the change plan in up to 256 characters.

    Attachments

    Images or documents showing the design before and after the change.

    1. You can upload multiple attachments.

    2. Supported formats: PDF, DOCX, and XLSX documents; JPG and PNG images.

    Before-change data

    The data before the change, taken by default from the linked change request change request's Affected data list.

    Link drawings, documents, or parts and choose the version to reference.

    After-change data

    The data after the change. Link drawings, documents, or parts and choose a version. The latest version is selected by default.。

  1. Select one or more change requests with Approved status.

  2. You can select items across multiple pages.

    New change notice: link change requests

  3. Linked requests appear in the list. Remove and relink them if needed.

    New change notice: view linked requests

Add before-change data

The list starts with the Affected data from the linked change requests and updates when requests are linked.

You can add other documents.

  • Click Add on the creation page and select the drawings, documents, or parts to include. Multiple selection is supported.

    New change notice: add before-change data

Linking drawings, documents, or parts requires view access to their file space and folder.

  • If a linked change request has no product, or the product has no linked file space:

Choose a file space, then select a folder.

Before-change data: choose a file space and create a folder

  • If the linked product already has a file space:

Choose a folder. The linked product's folder is selected by default.

Before-change data: choose a folder

  1. Select the drawings, documents, or parts at that location. Use the dropdown on the right to choose the version for each item.

    Before-change data: select documents and versions

  2. The selected documents appear in the list. Select multiple entries to remove them in bulk.

  3. Click Add again to include more drawings, documents, or parts.

    New change notice: before-change data list

  4. Click a document in the list to open its details in the right-hand panel.

    Before-change data: view document details

Add after-change data

Use the same steps to add after-change data.

  • Click Add on the creation page and select the drawings, documents, or parts to include. Multiple selection is supported.

    New change notice: add after-change data

Linking drawings, documents, or parts requires view access to their file space and folder.

  • If a linked change request has no product, or the product has no linked file space:

Choose a file space, then select a folder.

After-change data: choose a file space and create a folder

  • If the linked product already has a file space:

Choose a folder. The linked product's folder is selected by default.

After-change data: choose a folder

  1. Select the drawings, documents, or parts at that location. Use the dropdown on the right to choose the version for each item.

    After-change data: select documents and versions

  2. The selected documents appear in the list. Select multiple entries to remove them in bulk.

  3. Click Add again to include more drawings, documents, or parts.

    New change notice: after-change data list

Click a document in the list to open its details in the right-hand panel.

After-change data: view document details

Create the notice

  • Click Create to finish.

  • The new item then appears in the change request list.

    New change notice: Confirm button